Table templates
Verified Kition template

Project Gantt Planner Table Template

Plan workstreams with owners, start and end dates, progress, status, and readable dependency notes in a compact project table.

Verified 2026-09-02Inspect product source

Project Gantt Planner Table Template

Real fields and representative values

Table
TaskWorkstreamOwnerDatesProgress
Customer research synthesisResearchMaya ChenJul 20–2990%
Interaction designDesignSofia RiveraJul 27–Aug 735%

Best for

Project managers, product teams, agencies, and operators coordinating a time-bound delivery.

Use it when

You need a straightforward schedule source that can be filtered by owner, workstream, date, progress, and status.

Choose another system when

Do not use the starter for critical-path or resource-leveling decisions that require a specialized scheduling engine.

Inside the starter

A visible structure you can inspect.

These are the real fields, nodes, or visual elements that make the template useful. Rename them when your process differs; do not preserve a field only because it was bundled.

01

Task and Workstream — define and group scheduled work.

02

Owner, Start date, and End date — make responsibility and timing explicit.

03

Progress and Status — separate completion from state.

04

Dependency — explain the preceding work in readable form.

How to use it

From starter to reviewed workspace

  1. 1

    List tasks at a reviewable level of detail.

  2. 2

    Assign workstream, owner, start date, and end date.

  3. 3

    Write dependency names consistently so they can be checked.

  4. 4

    Update progress and status during the same review.

  5. 5

    Inspect date overlaps and blocked tasks before committing to the plan.

Product evidence

What is already real

  • The starter includes 3 project-plan records and 8 typed fields.
  • Research, design, and dependent work are represented.
  • Progress and status are separate fields.

Limits

What this template does not promise

  • Dependencies are descriptive rather than enforced links.
  • The template does not calculate a critical path.
  • Progress percentages require a shared team definition.

Completed artifact

Product Delivery Gantt Source Table Example

Inspect a project-plan table with research, design, ownership, date ranges, progress, status, and dependency context.

Inspect the example

Ready when you are.

Kition is a desktop AI workspace for connected documents, structured tables, editable designs, whiteboards, visual workflows, and reviewable AI agents.